SeismetraAI
by SeismicCheck LLC
FEMA P-154 (2015) · Level 1 · Los Angeles

Preliminary seismic screening with the source behind every value

Seismetra AI is a working environment for screening existing W1A, C1 and C2 buildings. AI prepares and cross-checks building data. A rules engine calculates the Level 1 score. A licensed engineer reviews and approves every result.

How it works
Wood-frame W1A, incl. soft first storiesConcrete C1 and C2Engineer approval on every result
Number of stories · SC-0101Verified
32 residential over parking
Document
Assessor record, p. 1: “NO. OF STORIES: 2”
Photo
P-02, street elevation: parking at grade
AI note
Record may count residential stories only
Decision
M. Ortiz, Engineer · justification recorded
Score impact
None for W1A with soil Type D (1–3 stories)
Example record. Data in this demo is illustrative.
Interactive demo

Screen one building from documents to issued report

Follow the six steps, or click through any screen. Use “Do this step” to move quickly during a presentation. Nothing you do here is saved.

How it works

From building files to an approved, versioned result

Documents for existing buildings span decades and often disagree. The platform keeps every value tied to where it came from, so the engineer can tell facts from assumptions, suggestions and gaps.

  1. 1
    Collect materials

    Permits, certificates of occupancy, assessor records, drawings and site photos are uploaded to one building record with a permanent ID.

  2. 2
    AI extracts and cross-checks

    Each suggested value links to a file, page and text excerpt. Photos produce observations, not conclusions. Conflicts are flagged.

  3. 3
    Engineer resolves

    The engineer accepts, corrects or rejects each value, records a justification, or requests more information. Unknown soil is marked DNK.

  4. 4
    Rules engine scores

    A version-controlled FEMA P-154 table gives the basic score, modifiers and minimum score. The language model explains the result but never sets coefficients.

  5. 5
    Approver signs off a version

    An authorized approver reviews sources and changes, then approves or returns that specific version. Approval rights are assigned, never self-selected.

  6. 6
    Report and change control

    AI drafts the report and the engineer approves the text. New data creates a new version for review. Issued reports stay in history.

Principles

What the software does, and what stays with the engineer

AI suggests, people decide

Suggested values never enter the verified record without an engineer's action. Accepting one field does not approve the screening.

The score comes from rules

Calculations run in a separate rules library with test cases. A change of prompt or model cannot change a number when inputs and methodology are the same.

Every value keeps its source

File, page, excerpt, original notation and converted units are stored with each value, along with who decided and why.

Nothing approved is overwritten

A material input change creates a new version and sends the dependent result back for review. Earlier approvals and issued reports remain on record.

A Level 1 score is not
  • a percentage of building safety or an earthquake prediction;
  • a determination of whether a building is fit for occupancy;
  • a decision on whether a municipal retrofit program applies to an address;
  • a substitute for the detailed evaluation that a program or engineer requires.
Who it is for

Built for engineering firms first

Primary usersEngineering and consulting firms

Screen portfolios of W1A and C1/C2 buildings, share review between engineers and approvers, and issue consistent reports.

Clients of the firmOwners and property managers

Receive approved results and a clear order for further evaluation through the engineering firm that serves them.

By separate agreementCities and agencies

Building inventories and priorities for further assessment, with methodology, access and reporting agreed in advance.

Pilot

Run a pilot on your own W1A or C1/C2 buildings

Before the pilot starts, we agree on the buildings, the available materials, the responsible engineers and the acceptance criteria. The pilot then measures:

  • time to prepare building records and reports;
  • share of AI suggestions the engineer had to correct;
  • completeness of source references;
  • number of comments raised during review.

We make no claims about accuracy or time savings until pilot results are available.

Contact
Emil Nalbantov
Founder, SeismicCheck LLC
Los Angeles, California